Checking the fit with the ballast |
All lined up nicely, |
A quick sharpening of the bit |
We clamped the keel to the ballast and drilled about 2 inches into it to get the correct position and angle for the keel bolts |
Trying to clear rust out of the iron |
We then turned it over to drill the rest of the way through, A bit of WD40 to keep things moving |
Even with two powerful drills we ended up using a vice grip and bar to turn the bit. Actually drilled quite quickly with it. |
The keel right where it belongs and the deadwood resting on top |
Keel in, floors laid in place |
The keel rebate meeting the stem rebate, The stem will be changed soon and halfed into the keel but its great it lined up |
No comments:
Post a Comment